Survey Results from Community Input on Design for Phase 3/2E, Phase 2, and Phase 1B

Posted on

Thank you to all who gave input at both community meetings and the online survey on the design for Phase 3/2E, Phase 2 Summit/Murrow interchange, and Phase 1B*.  The survey results are in and we are please to share them.  Click here to see the survey results.

Leave a Reply

Your email address will not be published. Required fields are marked *

*

*